41 construction payment terms in plain English, each with a real example, why it matters and what to watch for: retainage, pay app, SOV, lien waivers and more.

Quick answer: what is this page?
Last updated: November 23, 2026
Construction billing has its own language: pay apps, retainage, conditional releases, pay-when-paid. If you do not know the words, it is easy to sign the wrong paper, miss a deadline, or wait months for money you already earned. This glossary explains each term the way a contractor would explain it to a new office manager, with real numbers.
Jump to a term
Accounts receivable · AIA G702 · AIA G703 · AR aging report · Change order · Collection agency · Conditional release · Deposit · DSO · Final payment · Front-loading · Joint check · Late fee · Lien deadline · Lien waiver · Margin · Markup · Mechanics lien · Net 30 · Notice of intent to lien · Notice to owner · Pay application · Pay-if-paid clause · Pay-when-paid clause · Payment bond · Payment demand letter · Payment reminder · Payment terms · Percent complete · Preliminary notice · Progress billing · Prompt payment act · Recoverable depreciation · Retainage · Retainage release · Schedule of values · Statutory lien waiver form · Stored materials · Substantial completion · Time and materials · Unconditional release
New data: we studied 3,200 paid contractor invoices. The median wait is 33 days and 57% are paid late. See the Contractor Payment Report 2026 for your trade and state.
How you bill on a construction job, from the schedule of values to the monthly pay app.
Also called: pay request, progress billing request, draw request
A pay app is the monthly bill on a bigger job. It lists every part of the job, how much of each part is done, what you billed before, and what you are owed now. The GC or owner checks it before they pay.
Example: You have a $200,000 job. By the end of March you are 40 percent done, so you have earned $80,000. You already billed $45,000. Your March pay app asks for the difference, less retainage.
Why it matters: Most GCs only pay from an approved pay app. If it is late or wrong, your whole month of money slides to next month.
Watch out: Learn the GC's cut off date, often the 20th or 25th, and send it early. Attach lien waivers and backup the first time, so it does not bounce back.
Full guide: Pay application guide
Also called: application and certificate for payment, cover sheet
The G702 is the summary page of a pay app. It shows the original contract, approved change orders, work done to date, retainage held, payments so far and the amount due this time. The architect or owner signs it to approve payment.
Example: Contract $200,000 plus $10,000 in change orders makes $210,000. Work done to date is $84,000. Less 10 percent retainage ($8,400) and $45,000 paid before, this pay app asks for $30,600.
Why it matters: It is the page the owner and lender look at first. If the math on it is wrong, the whole pay app gets rejected.
Watch out: The numbers must match the G703 behind it, line for line. One typo and you wait another month.
Full guide: G702 and G703 guide
Also called: continuation sheet, SOV detail sheet
The G703 is the detail sheet behind the G702. Each row is one line from the schedule of values, with columns for work this period, work before, stored materials, percent done and balance left.
Example: Row 4 is drywall, worth $30,000. It was 20 percent done last month and is 50 percent done now. This month you bill $9,000 for drywall.
Why it matters: It is where the owner checks your progress line by line. Clear rows mean faster approval.
Watch out: Do not bill a line past 100 percent. Put change orders on their own new rows so they are easy to track.
Full guide: G702 and G703 guide
Also called: SOV, cost breakdown, billing breakdown
A schedule of values breaks the contract price into line items, like site work, framing, drywall and paint. It is agreed before the job starts, and every pay app bills against it.
Example: A $200,000 remodel might have 10 lines: demo $12,000, framing $30,000, electrical $25,000, and so on, adding up to $200,000.
Why it matters: A good SOV lets you bill fairly each month. A vague one leads to arguments about how much is done, and slow pay.
Watch out: Make lines small enough to measure. Put mobilization, bonds and general conditions on their own lines so you can bill them early.
Full guide: Schedule of values template
Also called: overvaluing early work
Front-loading means putting too much value on the first lines of the schedule of values, so you get paid more early in the job. It helps cash flow but makes owners nervous.
Example: Demo is really worth $8,000 but the SOV says $20,000. You get $12,000 extra in month one, and later lines are short.
Why it matters: Owners, lenders and architects watch for it. If they catch it, they may cut your SOV or hold your pay apps closer.
Watch out: Price early lines fairly. If you need cash up front, ask for a mobilization line or a deposit instead.
Full guide: Schedule of values guide
Also called: progress payments, monthly billing, draws
Progress billing means you bill as the work gets done, often once a month, instead of one bill at the end. Each bill covers the work finished since the last one.
Example: A 6 month job gets 6 monthly bills instead of waiting 6 months for one big check.
Why it matters: It keeps cash coming in so you can pay crews and suppliers while the job runs.
Watch out: Put the billing schedule in the contract: how often, the cut off date, and when payment is due.
Full guide: Progress payments guide
Also called: percentage of completion, % done
Percent complete is how much of a line item is finished. You bill that share of the line, minus what you already billed for it.
Example: Electrical is a $25,000 line. Last month it was 30 percent done ($7,500 billed). Now it is 70 percent done, so this month you bill $10,000 more.
Why it matters: It is the number most GCs argue about. A fair, easy to check number gets approved faster.
Watch out: Back it up with photos or a quick walk. If the GC cuts your percent, ask what they need to see.
Full guide: Progress payments guide
Also called: materials presently stored, materials on hand
Stored materials are things you bought for the job but have not installed yet, like windows in a warehouse. Some contracts let you bill for them before they go in.
Example: You buy $18,000 of HVAC units in April but install them in June. With stored materials billing, you can get paid for them in April.
Why it matters: It keeps you from paying for big orders out of your own pocket for months.
Watch out: The owner may want proof: invoices, photos, insurance and sometimes a bill of sale. Check the contract before you count on it.
Full guide: Pay application guide
Also called: CO, contract change, extra work order
A change order is a signed paper that changes the job's scope, price or time. Both sides sign it before the extra work starts.
Example: The owner wants 4 more outlets. You write a change order for $1,200 and 1 extra day, they sign, then you do the work.
Why it matters: Unsigned extras are the hardest money to collect. A signed change order turns "we never agreed to that" into a bill they must pay.
Watch out: Never start extra work on a verbal OK. Get the price and the signature first, even by text or email, then bill it on its own line.
Full guide: Free change order template
Also called: T&M, cost plus labor
Time and materials means you bill for the hours worked at a set rate, plus the cost of materials, often with a markup. It is used when the scope is hard to price ahead of time.
Example: A repair takes 6 hours at $95 an hour ($570) plus $300 of parts with a 20 percent markup ($360). The bill is $930.
Why it matters: It protects you when the job grows. You get paid for the real time spent.
Watch out: Customers fight T&M bills they did not expect. Send daily time sheets, and agree on a not to exceed amount if they ask.
Full guide: Contractor invoice template
Also called: add on, overhead and profit (O&P)
Markup is the amount you add on top of your cost to set your price. It is figured as a percent of cost.
Example: Your cost is $100. A 25 percent markup adds $25, so the price is $125.
Why it matters: Markup is what pays your overhead and profit. Too low and you can be busy and still lose money.
Watch out: A 25 percent markup is only a 20 percent margin. Many contractors mix these up and price too low.
Full guide: Markup and margin calculator
Also called: gross margin, profit margin
Margin is the share of the price that is profit after your costs. It is figured as a percent of the price, not the cost.
Example: You sell a job for $125 and it costs you $100. Your margin is $25 out of $125, which is 20 percent.
Why it matters: Margin tells you how much of every dollar you bring in you get to keep.
Watch out: If you want a 20 percent margin, you need a 25 percent markup. Use the calculator to switch between them.
Full guide: Markup and margin calculator
Also called: down payment, mobilization, upfront payment
A deposit is money paid before work starts. It covers set up, permits and the first materials.
Example: On a $40,000 commercial job, you ask for 10 percent ($4,000) at signing to order materials.
Why it matters: It means you are not paying for the customer's job out of your own bank account.
Watch out: Some states limit deposits on home jobs. In California, it is the lesser of 10 percent or $1,000 for home improvement. Check your state.
Full guide: Payment schedule guide
When the money is due, what can be held back, and the contract clauses that slow it down.
Also called: retention, holdback
Retainage is money the owner or GC holds back from each payment until the job is done. It gives them leverage to make sure the work gets finished and fixed.
Example: Your pay app is for $50,000 with 10 percent retainage. You get $45,000 now. The other $5,000 waits until the end of the job.
Why it matters: On a $500,000 job, 10 percent retainage is $50,000 of your profit sitting in someone else's bank. Many subs never chase it hard enough.
Watch out: Track retainage on every job, by job. Some states cap it or set a deadline to release it. Ask for a cut to 5 percent once the job is half done.
Full guide: Retainage guide
Also called: retention release, release of retainage
Retainage release is when the held back money is paid. It usually happens at substantial or final completion, after the punch list and closeout papers.
Example: The job hit substantial completion on June 1. You send a retainage invoice for $22,000 with your final waiver and closeout papers on June 3.
Why it matters: It is often your whole profit on the job. Waiting means it can sit for 6 months or more.
Watch out: Bill for it in writing as soon as you are allowed. Do not wait for the GC to remind you. Know your state's release deadline.
Full guide: Retainage calculator
Also called: beneficial occupancy, practical completion
Substantial completion is when the job is done enough for the owner to use it for its purpose, even if small punch list items are left.
Example: A store can open and sell to customers. Some trim and paint touch ups are still on the punch list.
Why it matters: It often starts the clock on retainage release, warranty and lien deadlines.
Watch out: Get the date in writing, like a signed certificate. Disputes about "when the job finished" can cost you your lien rights.
Full guide: Retainage guide
Also called: net 15, net 60, 2/10 net 30
Net 30 means the full amount is due 30 days after the invoice date. Net 15 and net 60 work the same way. "2/10 net 30" means the customer can take 2 percent off if they pay within 10 days.
Example: You send a $10,000 invoice on May 1 with net 30 terms. It is due May 31. After that, it is late.
Why it matters: The terms set when "late" starts, which sets when you can send reminders, charge late fees and escalate.
Watch out: Put the due date on the invoice, not just "net 30." People pay a date faster than a rule.
Full guide: Payment terms guide
Also called: terms of payment, billing terms
Payment terms are the rules for how and when you get paid. They cover the due date, deposits, progress payments, late fees and how they can pay.
Example: "50 percent deposit, 40 percent at rough in, 10 percent at final. Due on receipt. 1.5 percent a month on late balances. Card or ACH."
Why it matters: Clear terms in the contract are what let you enforce them later.
Watch out: Terms on the invoice that were never in the contract are hard to enforce. Agree on them before the job starts.
Full guide: Payment terms guide
Also called: prompt pay law, prompt pay act
A prompt payment act is a state law that sets how fast owners must pay GCs and how fast GCs must pay subs. Most also add interest when money is late.
Example: In many states, once a GC is paid, it must pay its subs within a set number of days, often 7 to 10, or owe interest.
Why it matters: It gives you a legal deadline to point to when a payment is late, and interest on top.
Watch out: Rules differ for private and public jobs, and by state. Check your state before you quote the law in a letter.
Full guide: Prompt payment rules by state
Also called: paid when paid
A pay-when-paid clause says the GC will pay the sub after the GC is paid by the owner. In many states, courts read it as a timing rule. The GC still has to pay within a fair time.
Example: The owner is 60 days late paying the GC. Under pay-when-paid, the GC can wait a while, but not forever.
Why it matters: It explains why your money can be slow even when your work is done. It usually does not mean you never get paid.
Watch out: Ask what "a reasonable time" means in your state. Keep your lien rights alive while you wait.
Full guide: Prompt payment rules by state
Also called: contingent payment clause
A pay-if-paid clause says the sub only gets paid if the GC gets paid. If the owner never pays, the sub may never get paid either.
Example: The owner goes broke. With pay-if-paid, the GC may not owe the sub anything for the last 2 months of work.
Why it matters: It moves the owner's risk of not paying onto you. That is a big risk.
Watch out: Some states ban or limit it. Read your contract before you sign and push to change "if" to "when." Your lien rights may still protect you.
Full guide: Prompt payment rules by state
Also called: finance charge, interest on late payments
A late fee is a charge added to a bill that is paid after the due date. It can be a flat fee or a monthly percent.
Example: A $10,000 bill is 30 days late. At 1.5 percent a month, the late fee is $150.
Why it matters: It gives customers a reason to pay you before they pay others.
Watch out: It must be in your contract or agreed terms, and state law may cap the rate. Use our calculator to see what you can charge.
Full guide: Late fee calculator
Also called: two party check, joint payee check
A joint check is made out to two payees, like a sub and its supplier. Both have to sign it before it can be cashed.
Example: The GC writes a $12,000 check to "ABC Electric and XYZ Supply." ABC signs, XYZ signs, and XYZ keeps its share for the wire it sold.
Why it matters: GCs use joint checks to make sure suppliers get paid, so suppliers do not file liens.
Watch out: Read any joint check agreement before you sign. Use a conditional waiver tied to the check, so you are covered if it bounces.
Full guide: Lien waivers and joint checks
Also called: final draw, closeout payment
Final payment is the last payment on the job. It usually includes the last of the contract balance and your retainage.
Example: Contract balance $8,000 plus $20,000 retainage. Your final pay app asks for $28,000.
Why it matters: It is often the biggest and slowest check of the job, because closeout papers hold it up.
Watch out: Start closeout early: warranties, manuals, as builts and final lien waivers. Sign a conditional final waiver, not an unconditional one, until the money clears.
Full guide: Final lien waiver forms
The tools that protect your right to get paid, and the papers you sign to give them up.
Also called: construction lien, materialman's lien
A mechanics lien is a legal claim on a property when someone who worked on it or supplied materials is not paid. The lien sits on the property title until it is paid or removed.
Example: You did $35,000 of roofing and the owner will not pay. You file a lien, and now the owner cannot sell or refinance without dealing with your bill.
Why it matters: It is one of the strongest tools a contractor has. Many bills get paid within days of a lien or a lien warning.
Watch out: Every state has strict steps and deadlines. Miss one and the lien fails. Check your state page before you file.
Full guide: Mechanics lien deadlines by state
Also called: lien filing deadline, time to file
A lien deadline is the last day you can file a mechanics lien. It is counted from a date like your last day of work or job completion.
Example: In California, most claimants must record a lien within 90 days after the job is finished. It can be shorter if the owner records a notice of completion.
Why it matters: Miss the deadline by one day and you lose the right to lien, forever, on that job.
Watch out: Track your last day of work on every job. Use the calculator for your state and role.
Full guide: Lien deadline calculator
Also called: pre-lien notice, prelim, notice of furnishing
A preliminary notice tells the owner, and often the GC and lender, that you are working on the job and have lien rights. Many states require it early to protect your right to file a lien later.
Example: In California, you send a preliminary notice within 20 days of first working on the job to fully protect your lien rights.
Why it matters: Skip it and you may have no lien rights at all if you do not get paid.
Watch out: Send it on every job, even with customers you trust. It is a normal business step, not a threat.
Full guide: Preliminary notice by state
Also called: NTO
Notice to owner is the name some states use for a preliminary notice. Florida is the best known example.
Example: In Florida, a sub or supplier who does not deal directly with the owner sends the notice to owner within 45 days of first furnishing work or materials.
Why it matters: Without it, you usually cannot lien in that state.
Watch out: Send it by a method you can prove, like certified mail, and keep the receipt.
Full guide: Preliminary notice by state
Also called: NOI, intent to lien letter, lien warning
A notice of intent to lien is a letter that says you will file a lien if you are not paid by a certain date. A few states require it before you file. In most it is optional.
Example: "If we do not receive $14,200 by June 15, we will record a mechanics lien on 123 Main St."
Why it matters: It often gets you paid without filing, because owners do not want a lien on their property.
Watch out: Only send it if you are ready to file, and send it early enough to still beat your lien deadline.
Full guide: Notice of intent to lien guide
Also called: lien release, release of lien
A lien waiver is a signed paper that gives up your lien rights for an amount you have been paid, or are about to be paid. Owners and GCs ask for one with each payment.
Example: You get a $25,000 progress payment and sign a waiver for $25,000 of work through April 30.
Why it matters: It is how the owner knows they will not get a surprise lien. Without it, many will not release payment.
Watch out: Check the amount, the dates and what is left out, like retainage and unpaid change orders, before you sign.
Full guide: Free lien waiver forms
Also called: conditional lien waiver
A conditional release gives up your lien rights only after the payment actually reaches you. If the check bounces, the waiver does not count.
Example: The GC needs a waiver to release your $30,000. You sign a conditional waiver. It only takes effect when the $30,000 clears.
Why it matters: It lets you hand over paperwork without giving up your rights before you are paid.
Watch out: This is the one to sign before the money is in your bank. Some states require their own wording.
Full guide: Conditional vs unconditional waivers
Also called: unconditional lien waiver
An unconditional release gives up your lien rights right away, no matter what. It works even if the check never clears.
Example: You sign an unconditional waiver for $30,000 on Monday. The check bounces on Wednesday. Your lien rights for that $30,000 are still gone.
Why it matters: It is the riskiest paper a contractor signs.
Watch out: Only sign it after the money has cleared your bank. If someone pushes for it early, give a conditional release instead.
Full guide: Conditional vs unconditional waivers
Also called: state lien waiver form
Some states write the exact lien waiver wording into the law. In those states, a waiver must follow the state form or it may not count.
Example: Texas, California, Arizona, Nevada, Michigan, Florida, Georgia, Mississippi, Utah, Massachusetts and Wyoming all have state forms.
Why it matters: Using the wrong form can make a waiver void, or can give up more than you meant.
Watch out: Use the state form, word for word. Our state pages have free Word copies.
Full guide: State lien waiver forms
Also called: labor and material bond, Miller Act bond
A payment bond is a promise from a surety company to pay subs and suppliers if the GC does not. You cannot lien public property, so public jobs use bonds instead.
Example: On a federal job above a set dollar amount, the Miller Act requires the GC to post a payment bond. Most states have similar laws for state and city jobs.
Why it matters: On a public job, the bond is your safety net instead of a lien.
Watch out: Bond claims have their own notice steps and deadlines. Get a copy of the bond at the start of the job.
Full guide: Lien and bond deadlines
How to track what you are owed and what to do when a bill goes late.
Also called: receivables, AR, money owed to you
Accounts receivable is all the money customers owe you for work you have already billed. It is earned money that is not in your bank yet.
Example: You have 22 open invoices adding up to $186,000. That is your AR.
Why it matters: Profit on paper does not pay crews. AR is where your cash is stuck.
Watch out: Look at AR every week, not just at month end. The longer a bill sits, the less likely it gets paid.
Full guide: Construction AR guide
Also called: aged receivables, aging schedule
An AR aging report lists unpaid invoices grouped by how late they are: current, 1 to 30, 31 to 60, 61 to 90 and over 90 days.
Example: Your report shows $120,000 current, $40,000 at 31 to 60 days and $26,000 over 90 days. The $26,000 needs calls today.
Why it matters: It tells you who to chase first and shows if your collections are getting better or worse.
Watch out: Bills over 90 days are much harder to collect. Act at 30 days, not 90.
Full guide: AR aging report guide
Also called: days sales outstanding, average collection period
DSO is the average number of days it takes to get paid after you bill. The formula is AR divided by sales, times the number of days in the period.
Example: You have $150,000 in AR and billed $300,000 in the last 90 days. DSO is $150,000 divided by $300,000, times 90, which is 45 days.
Why it matters: Every day you cut from DSO puts cash in your bank sooner, without selling one more job.
Watch out: Track it every month by customer. One slow customer can drag the whole number up.
Full guide: Construction DSO calculator
Also called: dunning email, past due notice, follow up
A payment reminder is a short email or text that tells a customer a bill is coming due or is late. Good reminders go out on a set schedule.
Example: A friendly note 3 days before the due date, a firm note at 7 days late, and a final note at 21 days late.
Why it matters: Most late bills are not people refusing to pay. They forgot. Reminders fix that.
Watch out: Keep them short and polite, with the amount, due date and a pay link. Automate them so they go out even on busy weeks.
Full guide: Payment reminder templates
Also called: final demand, letter before action
A demand letter is a firm written request to pay a past due bill by a set date, or face next steps like a lien, a collection agency or court.
Example: "Invoice 1042 for $8,600 is 75 days past due. Pay in full by July 1, or we will file a mechanics lien and pursue collection."
Why it matters: It shows you are serious and creates a paper trail if you go further.
Watch out: Only list next steps you will really take. Keep it factual and calm. Send it by a method you can prove.
Full guide: Free demand letter template
Also called: debt collector, third party collections
A collection agency chases unpaid bills for you and keeps a share of what it collects.
Example: An agency collects $10,000 of an old bill and keeps 30 percent. You get $7,000.
Why it matters: It can recover old bills, but it costs a lot and can end the customer relationship.
Watch out: Agencies often take 20 to 50 percent. Most contractors get more by following up early and steadily on their own.
Full guide: Collection agency vs automation
Also called: RD, held back depreciation, holdback
Recoverable depreciation is insurance money that is held back until the repair is done. The insurer pays the actual cash value first, then the rest after proof of completion.
Example: A roof claim is worth $20,000. The insurer pays $15,000 first and holds $5,000. You finish, send photos and the final invoice, and the $5,000 is released.
Why it matters: For roofing and restoration contractors, it is often the last part of the profit on the job.
Watch out: Most policies set a deadline to claim it. Send the completion papers right away, and follow up with the adjuster until it is paid.
Full guide: Recoverable depreciation guide
These pairs cause the most confusion, and the most lost money.
| These two | The difference | Learn more |
|---|---|---|
| Retainage vs deposit | A deposit is paid to you before work starts. Retainage is held back from you until the end. | Retainage |
| Markup vs margin | Markup is a percent of cost. Margin is a percent of price. A 25 percent markup is a 20 percent margin. | Markup |
| Pay-when-paid vs pay-if-paid | Pay-when-paid delays your payment. Pay-if-paid can cancel it if the owner never pays. | Pay-if-paid |
| Conditional vs unconditional release | Conditional works only once the money clears. Unconditional works the moment you sign. | Conditional release |
| Preliminary notice vs notice of intent vs lien | The preliminary notice comes at the start of the job. The notice of intent is a warning when you are not paid. The lien is the actual claim on the property. | Preliminary notice |
| Pay app vs invoice | An invoice is a simple bill. A pay app is a monthly bill that tracks every line of the schedule of values, change orders and retainage. | Pay app |
| Substantial vs final completion | Substantial means the owner can use it. Final means everything, including the punch list and closeout papers, is done. | Substantial completion |
Here is how the terms fit together on a real pay app. The job is a $200,000 contract with $10,000 in approved change orders and 10 percent retainage. The work is 40 percent done, and you were paid $45,000 last month.
| Line on the G702 | Amount |
|---|---|
| 1. Original contract sum | $200,000 |
| 2. Approved change orders | $10,000 |
| 3. Contract sum to date (1 + 2) | $210,000 |
| 4. Work completed and stored to date (40 percent) | $84,000 |
| 5. Retainage (10 percent of line 4) | $8,400 |
| 6. Earned less retainage (4 minus 5) | $75,600 |
| 7. Less previous payments | $45,000 |
| 8. Current payment due (6 minus 7) | $30,600 |
| 9. Balance to finish, plus retainage (3 minus 6) | $134,400 |
So you bill $30,600 this month, and $8,400 of retainage waits until the end. Send a conditional release for $30,600 with the pay app. Swap it for an unconditional one after the money clears. See the full pay application guide for every column.
Knowing the words is step one. Getting paid is step two.
AR Workflow sends payment reminders for you, tracks every unpaid invoice and retainage balance, and shows who is late at a glance. Bring one overdue invoice to a demo and we will show you how it works.
A deposit is paid to you before work starts. Retainage is held back from you until the job is done. One helps your cash flow and the other hurts it.
An invoice is a simple bill. A pay app is a monthly bill on bigger jobs that tracks every line of the schedule of values, change orders and retainage.
A conditional release is safer. It only works once your payment clears. Sign the unconditional release only after the money is in your bank.
It means the GC can wait to pay you until the GC is paid, but in many states only for a fair amount of time. Check your state prompt payment law.
If you bill monthly on bigger jobs, learn the pay app terms, retainage, lien waivers and your state lien deadlines first. Those decide how fast you get paid.
Use our lien deadline calculator and the prompt payment rules by state.
Tools and related guides
Tired of chasing payments?
Bring one overdue invoice to a demo. We will show you how AR Workflow chases it for you.
This glossary is general information, not legal advice. Laws differ by state and change over time. AIA, G702 and G703 are trademarks of the American Institute of Architects.
Sam owned and ran three restoration companies for more than 14 years and collected over $100 million in receivables. He built AR Workflow in 2020 to give contractors the collections system he wished he'd had.
AI writes the emails, sends the texts, and leaves the voicemails. Your team handles the conversations that matter, and your cash keeps moving.